Location Telangana
-
Scope Operation & Maintenance of pump houses and 220 kV switchyard
Rajive Bhima LIS – O&M of Pump Houses and 220 kV Switchyard
At Rajive Bhima Lift Irrigation Scheme in Telangana, the engagement covers Operation & Maintenance of pump houses and the 220 kV switchyard.
Critical lift-irrigation O&M spanning pumping infrastructure and high-voltage electrical assets.
Infrastructure Highlight
Switchyard included in the documented O&M engagement.
Project Snapshot
Location
Telangana
Engagement
Operation & Maintenance
Infrastructure
Pump Houses + Switchyard
Technical Highlight
220 kV Switchyard
Project Scope
The confirmed project-specific scope in IEPL’s corporate content covers the following responsibilities:
- Operation & Maintenance of Rajive Bhima LIS pump houses
- Operation & Maintenance of the 220 kV switchyard
- Support within a state lift-irrigation infrastructure environment
Engineering Focus
High-Availability O&M for Critical Pumping Infrastructure
IEPL positions its O&M practice around reliable operation, planned maintenance, rapid restoration, safety and disciplined reporting for electro-mechanical assets.
Relevant IEPL Capability
IEPL brings multidisciplinary engineering, execution and lifecycle-support capability to projects of this nature.
Pump House Operation
Operation of pumps, motors, valves and control systems with operating records.
Preventive & Predictive Maintenance
Routine inspection, vibration/temperature checks, alignment review and OEM-based maintenance scheduling.
Breakdown Response
Emergency restoration, fault tracing, repair coordination and service-spares support.
Reporting & Documentation
Daily logs, energy/fault records, DLP documentation and periodic performance reporting.
Other IEPL Engagements at Rajive Bhima LIS
The approved content also records separate IEPL starter/consultancy activity at the same lift-irrigation scheme. These items are presented as related engagements rather than being folded into the O&M contract scope.
- Supply & commissioning of 4 MW FCMA soft starters
- 4 MW / 11 kV motor application referenced in the Starting Solutions portfolio
- 4 MW FCMA starter for a CV pump
- FCMA soft-starter retrofit guidance
Planning a Similar Project?
Talk to Integrated Engineering about EPC, O&M, SCADA, pumping or electro-mechanical infrastructure requirements.